Blog
38 posts about instagram-series.
A home and an investment are different purchases of the same land. Five questions where the answers pull apart, and the one record both of them begin on.
8 Sep 2025Inside IMC or in a gram panchayat: who sanctions the colony, who lets you build, who owns the pipe and who sends the bill, and how to find out before you pay.
8 Sep 2025Who paid and whose name is on the deed are two different questions. What the choice changes, and why to settle it at home, weeks early, not at the desk.
8 Sep 2025What you can verify about an Indore plot from Pune or Dubai, what only feet on the ground can tell you, and why the money always moves last.
8 Sep 2025Stamp duty, the four-month clock, Aadhaar at the counter, e-registration from home, and why a registered deed still leaves mutation to be done.
8 Sep 2025Find your land on the development plan, read its zone off the colour, spot roads not yet built, find the building rules, and lay your colony on top.
8 Sep 2025How the boundaries on the Indori Zameen map were placed and checked, who did the work, and why an unplaceable colony is left unmapped.
8 Sep 2025Plot numbers, road widths, open space, the reserved series and boundary lengths: how to read each one off a sanctioned layout plan before you pay.
8 Sep 2025Registry done, RERA number, notary, boundary wall, divert later, the neighbour built — six things said in good faith, and what the record says instead.
8 Sep 2025Why a brochure binds nobody and a sanctioned layout does, what reserved land looks like on the sheet, and the one question to ask when the amenity is not on it.
8 Sep 2025Five two-minute checks on any plot in Indore — registration, khasra, zone, proposed roads, sanctioned plan — and the red flag hiding inside each one.
8 Sep 2025Less of the value funded, fewer years, sometimes a deadline to build, a tax break that waits — and a bank that checks the ground before it checks you.
8 Sep 2025The token is the first money you pay and the moment you have least on paper. Six things to put in the agreement to sell before it moves.
8 Sep 2025The land is usually fine; the paper decides. The five documents that separate a plot you can build on from one you can only argue about, and how to read each.
8 Sep 2025A clean plot from a developer who does not finish is still a problem. An afternoon in a colony they completed, five things to look at, what they must prove.
8 Sep 2025A corner gives you two open sides and a bill for them; a facing decides where the sun and the gate go. What is measurable, what is preference, what matters.
8 Sep 2025Zone, roads, distance, neighbours, register: five reads that tell you what a location in Indore already is, without a single phone call.
8 Sep 2025A developer sells you a project and a promise; an owner sells you one parcel and its paper trail. The questions for each, and the three that never change.
8 Sep 2025Land is bought in April and lived on in August. The slope, the fill, the drain, the supply and the zone — six checks a dry-season site visit misses.
8 Sep 20251,500 sq ft, 139.4 sq m, 166.7 gaj and 'one bigha' can all describe the same plot. How to put two plots in one unit before you compare a price.
8 Sep 2025Who must register with MP RERA, what an agent's number means, and the four checks a registration does not replace: title, ownership, coverage and sanction.
8 Sep 2025A gate, a road and a wall can be finished years before a working connection. Six questions and one visit after dark tell you what you are really buying.
8 Sep 2025Prime location, approved, clear title, loan available — what each pamphlet phrase can honestly mean, and the one question that puts it on paper.
8 Sep 2025Khasra, khatauni, diversion, layout sanction, guideline rate, FAR and setback, mutation: what each word on your plot's papers means, and why it matters.
8 Sep 2025One day you are the seller, and every gap in your file becomes a discount. The five things to get in order years before you list a plot.
8 Sep 2025Boundary disputes begin as a few feet nobody measured. The six ways a line goes wrong, and the five cheap things to do before you build.
8 Sep 2025A new master plan, a metro ring partly open, and a law that plans Indore as a region: what each changes for a plot, and where to check your own land.
8 Sep 2025Diversion only changes what a parcel is assessed for on the revenue record. The two permissions that must follow, and which paper to ask for by date.
8 Sep 2025A plot can carry a mortgage, a court attachment or a pending suit you cannot see from the gate. What an encumbrance certificate shows, and what it misses.
8 Sep 2025Five questions to put to a real estate agent before you pay a token, what a good answer sounds like, and why an agent with good stock enjoys them.
8 Sep 2025The nine stages of buying a plot in Indore, in the order they belong, and why the token should come fifth, after the record and the ground.
8 Sep 2025A plot and a flat are different products, not two prices for one thing. What each asks of you, and the five checks that belong to each.
8 Sep 2025Who taxes your plot, why the seller stays liable until the record is changed, and what a tax receipt does and does not prove about ownership.
8 Sep 2025On a ₹50 lakh plot you pay ₹55.25 lakh before a brick is laid. How stamp duty and the guideline rate work in Madhya Pradesh, and the four costs that come after.
8 Sep 2025Walk all four sides, pace the road, return at another hour, look down and up, ask the neighbours, photograph the markers with the date on. The site visit list.
8 Sep 2025Hundreds of hotels for one night, fifty restaurants for dinner, five or ten colonies for the plot you keep for life. How to see the whole market first.
8 Sep 2025Registration, khasra, zoning, proposed roads, the sanctioned layout, building limits, plot position and promoter: eight questions and where each answer sits.
8 Sep 2025Indore's registered colonies on one map, each with its boundary, sanctioned layout, zoning and papers: what is there, what is not, how to read one fast.
8 Sep 2025Every colony's boundary, its approved layout, its zoning and its paperwork — on one screen. Signing in is free.